NG15 No134 Restoration » 'Contract' Work » Tender » Tender Body August 2011  (15 Slides)     [Page 1 of 2] :: Jump To  
  You have reached the first page You have reached the first page      Up one level      Next page Last page  
The driver's side of the tender with the coal space starting to take shape. Photo: Pam Smith
A view looking down onto the driver's side of the tender showing the coal space starting to take shape. Photo: Pam Smith
A view looking down onto the driver's side of the tender showing the front of the coal space. Photo: Pam Smith
An inside view indicating there's still much to do at the front and for the bunker. Photo: Pam Smith
   
   
   
   
The rear of the tender seen on the 5th August 2011. Photo: Peter Randall
A good view of the upper side showing the water space complete as 5th August 2011. Photo: Peter Randall
A top view showing that the coal space is almost complete. Photo: Peter Randall
By the 23rd August the front lockers and bunker doors were in the process of being fitted. Photo: Pam Smith
   
   
   
   
Tender Body Progress August 2011
Album last updated on 2011-12-02
Powered by jAlbum 9 and BluPlusPlus skin
Photographs © as indicated.