NG15 No134 Restoration » 'Contract' Work » Tender » Tender Body July 2011  (9 Slides)     [Page 1 of 2] :: Jump To  
  You have reached the first page You have reached the first page      Up one level      Next page Last page  
The tender body as seen from the fireman's end on the 7th July 2011. Photo: Pam Smith
A view down the side of the tender showing the jig base used to set the body square and level. Photo: Pam Smith
An overhead view into the tender water space. Photo: Pam Smith
An overhead view into the tender water space. Photo: Pam Smith
   
   
   
   
Later in the month, on the 19th July, the Tender sides were being positioned and clamped in place. Photo: Peter Randall
A different (rear) view showing the drivers top side clamped in place. Again on the 19th July. Photo: Peter Randall
The side is shown again taken three dayes later on the 22nd July. Photo: Ben Smith.
A top view on the 22nd July showing the tender interios and the top side positioned in place. Photo: Ben Smith.
   
   
   
   
Tender Body Progress July 2011
Album last updated on 2011-12-02
Powered by jAlbum 9 and BluPlusPlus skin
Photographs © as indicated.