NG15 No134 Restoration » 'Contract' Work  (62 Slides)     [Page 1 of 1] :: Jump To  
  Up one level  

Details of restoration and refurbishment work outside of the working parties

Sandblasting * Sandblasting * Sandblasting the frames - October 2009
Wheel Re-profiling * Wheel Re-profiling * The wheel turning at Boston Lodge
Tender * Tender * Tender Body
Rear Frame Stretcher * Rear Frame Stretcher * Refurbishment of the rear frame stretcher
  Sandblasting the frames - October 2009  
  The wheel turning at Boston Lodge  
  Tender Body  
  Refurbishment of the rear frame stretcher  
Details of restoration and refurbishment work outside of the working parties
Album last updated on 2012-01-23
Powered by jAlbum 9 and BluPlusPlus skin
Photographs © as indicated.