NG15 No134 Restoration » Sandblasting »  Viewing CRW_1593-01     [Image 6 of 9]  :: Jump To  
  First slide Previous slide      Show/Hide EXIF Info Index Page Start/Stop the slide show      Next slide Last slide  
Shotblasting in progress showing some areas still to do.Photo: Clive Briscoe

The sandblasted frames on the Fireman's side.Photo: Laurence Armstrong

The contracter's notice.Photo: Laurence Armstrong

The rear pony truck having been sandblasted.Photo: Laurence Armstrong

The sandblasted Krauss-Helmholtz truck frames.Photo: Laurence Armstrong

Next slide
 
652 x 491
The sandblasted frames on the Driver's side.Photo: Laurence Armstrong

Th inside of the frames showing some areas of wastage.Photo: Clive Briscoe

The frames now painted in primer following shotblasting. Photo: Andie Shaw.

The sandblasted front left cylinder.
Photo: Laurence Armstrong
Sandblasting the frames - October 2009
Album last updated on 2011-06-08
Powered by jAlbum 9 and BluPlusPlus skin
Photographs © as indicated.