Gallery » Working Parties » 2016 Working Parties » WWEJune16
100 0852
Image 1 of 7
First job was sorting through the motion ready for the machining and fitting of new bushes.
Photo: Laurence Armstrong
IMG 0984
Image 2 of 7
The motion was then matched with the various pins and left out ready to be worked on by the full time staff.
Photo: Laurence Armstrong
100 0855
Image 3 of 7
The motion Crossheads left ready for maching by the full time staff.
Photo: Laurence Armstrong
IMG 0985
Image 4 of 7
Motion left out ready for maching by the full time staff.
Photo: Laurence Armstrong
IMG 0988
Image 5 of 7
New lubrication fittings for the slide bars.
Photo: Laurence Armstrong
IMG 0989
Image 6 of 7
New lubrication fittings for the slide bars on the left hand side (but still needing their brass pipe fittings to be attached).
Photo: Laurence Armstrong
100 0858
Image 7 of 7
One of the weirs for the steam sander mechanism that need to be fitted against the side of the frames between the wheels.
Photo: Laurence Armstrong
Generated by jAlbum 13.1.2, Matrix 32